Project Completion Certificate (Ground Water)
Scheme ID: 20097001 Name of Scheme: Taiyabpur Qazi Village WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Jun-2023 Actual Date of Completion (Capex): 01-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WEELL 24.02M/95.59M Taiyabpur Qazi 29.431222 78.22174
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 15 HP 830LPM/ 47M Taiyabpur Qazi 29.431222 78.22174
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL/14M Taiyabpur Qazi 29.431222 78.22174
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 63 6.19
2 HDPE PIPE PN-6: CLASS PE-100 75 1.02
3 HDPE PIPE PN-6: CLASS PE-100 90 0.51
4 HDPE PIPE PN-6: CLASS PE-100 110 0.49
5 HDPE PIPE PN-6: CLASS PE-100 140 3.15
6 HDPE PIPE PN-6: CLASS PE-100 160 0.12
7 HDPE PIPE PN-6: CLASS PE-100 200 0.45
HSC Connection
Sno. Total Nos.
1 530
Other Details
2.28
2.28
2.25
28-Feb-2026
01-Mar-2026