Scheme ID: 20097023 Name of Scheme: BANKATA SECOND GP WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Oct-2024 Actual Date of Completion (Capex): 25-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 133.95 BANAKATA SECOND 27.064777 83.005896
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 400LPM / 44 MTR BANAKATA SECOND 27.064777 83.005896
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVR HEAD TANK 125KL / 14 MTR BANAKATA SECOND 27.064777 83.005896
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 / DI PIPE 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE-100 PE-6 / HDPE PIPE 75 1.082
2 PE-100 PE-6 / HDPE PIPE 90 0.122
3 PE-100 PE-6 / HDPE PIPE 110 0.372
4 PE-100 PE-6 / HDPE PIPE 125 0.380
5 PE-100 PE-6 / HDPE PIPE 140 0.408
6 PE-100 PE-6 / HDPE PIPE 63 5.828
HSC Connection
Sno. Total Nos.
1 369
Other Details
2.29
2.29
2.22
25-Mar-2025
09-Sep-2025