| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097476 | Name of Scheme: NARAINI | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 6670 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 30-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 520 LPM" | 24 M / 105.85 M | Naraini | 25.742657 | 81.008964 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP Submersible Pump | 520 LPM / 60 M | Naraini | 25.742657 | 81.008964 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 200 KL / 16 M | Naraini | 25.742657 | 81.008964 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.010 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 63 | 3.79585 | |
| 2 | HDPE PIPE PN-6 | 75 | 2.14515 | |
| 3 | HDPE PIPE PN-6 | 90 | 3.45 | |
| 4 | HDPE PIPE PN-6 | 110 | 1.4305 | |
| 5 | HDPE PIPE PN-6 | 125 | 1.6527 | |
| 6 | HDPE PIPE PN-6 | 140 | 1.08275 | |
| 7 | HDPE PIPE PN-6 | 160 | 0.5786 | |
| 8 | HDPE PIPE PN-6 | 200 | 1.235 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1082 |