| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097487 | Name of Scheme: FARIDPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2140 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 02-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 440 LPM" | 16 M / 116 M | Faridpur | 25.835625 | 80.869228 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP Submersible Pump | 440 LPM / 60 M | Faridpur | 25.835625 | 80.869228 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 KL / 14 M | Faridpur | 25.835797 | 80.869088 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 125 | 0.0185 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE-100 | 200 | 0.0395 | |
| 2 | HDPE PN-6 PE-100 | 180 | 0.695 | |
| 3 | HDPE PN-6 PE-100 | 160 | 0.212 | |
| 4 | HDPE PN-6 PE-100 | 140 | 0.3527 | |
| 5 | HDPE PN-6 PE-100 | 125 | 0.163 | |
| 6 | HDPE PN-6 PE-100 | 110 | 0.329 | |
| 7 | HDPE PN-6 PE-100 | 90 | 0.6059 | |
| 8 | HDPE PN-6 PE-100 | 75 | 1.5647 | |
| 9 | HDPE PN-6 PE-100 | 63 | 1.8005 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 496 |