Project Completion Certificate (Ground Water)
Scheme ID: 20097510 Name of Scheme: DASAULI No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 4070 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.00/98.30 DASAULI 25"814878"N 80"500684"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 790/60 DASAULI 25"814878"N 80"500684"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250/14 DASAULI 25"814878"N 80"500684"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I.-K-9 100 0.0150
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 180 0.174
2 HDPE 160 0.7473
3 HDPE 140 1.647
4 HDPE 125 0.294
5 HDPE 110 1.6979
6 HDPE 90 1.7524
7 HDPE 75 1.3129
8 HDPE 63 6.913
HSC Connection
Sno. Total Nos.
1 848
Other Details
3.76
0.00
3.76
27-May-2025
28-May-2025