Project Completion Certificate (Ground Water)
Scheme ID: 20097517 Name of Scheme: KANDHIYA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4290 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 16-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 870 LPM" 29 M / 105.3 M Kandhiya 25.786481 80.856136
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20 HP Submersible Pump 870 LPM / 60 M Kandhiya 25.786481 80.856136
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 250 KL / 20 M Kandhiya 25.786518 80.856125
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 200 0.3125
2 HDPE PN-6, PE-100 160 0.3565
3 HDPE PN-6, PE-100 140 2.616
4 HDPE PN-6, PE-100 110 1.1212
5 HDPE PN-6, PE-100 90 2.5795
6 HDPE PN-6, PE-100 75 2.0936
7 HDPE PN-6, PE-100 63 4.2917
HSC Connection
Sno. Total Nos.
1 878
Other Details
3.73
3.73
3.73
15-Aug-2025
16-Aug-2025