| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097517 | Name of Scheme: KANDHIYA | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4290 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 16-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 870 LPM" | 29 M / 105.3 M | Kandhiya | 25.786481 | 80.856136 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 20 HP Submersible Pump | 870 LPM / 60 M | Kandhiya | 25.786481 | 80.856136 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 250 KL / 20 M | Kandhiya | 25.786518 | 80.856125 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 150 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6, PE-100 | 200 | 0.3125 | |
| 2 | HDPE PN-6, PE-100 | 160 | 0.3565 | |
| 3 | HDPE PN-6, PE-100 | 140 | 2.616 | |
| 4 | HDPE PN-6, PE-100 | 110 | 1.1212 | |
| 5 | HDPE PN-6, PE-100 | 90 | 2.5795 | |
| 6 | HDPE PN-6, PE-100 | 75 | 2.0936 | |
| 7 | HDPE PN-6, PE-100 | 63 | 4.2917 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 878 |