Project Completion Certificate (Ground Water)
Scheme ID: 20097540 Name of Scheme: CHHICHHINI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3420 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/120.30 CHHICHHNI 250.819705" N 80.870803"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 700 / 60 CHHICHHNI 250.819705" N 80.870803"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 200 KL/ 14 M CHHICHHNI 250.819705" N 80.870803"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 125 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 2.113
2 HDPE 160 0.4201
3 HDPE 125 0.493
4 HDPE 110 1.1171
5 HDPE 90 2.4754
6 HDPE 75 2.1734
7 HDPE 63 3.8921
HSC Connection
Sno. Total Nos.
1 596
Other Details
3.11
0.00
3.11
23-Mar-2025
24-Mar-2025