| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097759 | Name of Scheme: SEMRA | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3060 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 23-Jan-2025 | Actual Date of Completion (Capex): 13-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube Well | 22 Mtr / 156.3 Mtr | Semra | 25.916477 | 80.981866 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump (17.5 HP) | 640 LPM / 60 Mtr | Semra | 25.916477 | 80.981866 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Tank | 200 KL / 14 Mtr | Semra | 25.861466 | 80.796977 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 Pipe | 125 | 0.01850 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6 | 63 | 2.42730 | |
| 2 | HDPE Pipe PN-6 | 75 | 1.76240 | |
| 3 | HDPE Pipe PN-6 | 90 | 1.59420 | |
| 4 | HDPE Pipe PN-6 | 110 | 0.8972 | |
| 5 | HDPE Pipe PN-6 | 140 | 0.004 | |
| 6 | HDPE Pipe PN-6 | 160 | 0.9113 | |
| 7 | HDPE Pipe PN-6 | 200 | 0.04360 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 633 |