Project Completion Certificate (Ground Water)
Scheme ID: 20097849 Name of Scheme: OTI No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 2950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 28-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 590 LPM 12 M / 69.5 M Oti 25.731062 80.596659
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 35.40 m3 / 60 M Oti 25.731062 80.596659
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 175 KL / 22 M Oti 25.731136 80.596559
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.0238
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 2.946
2 HDPE PN-6 75 1.8223
3 HDPE PN-6 90 2.3319
4 HDPE PN-6 110 1.4357
5 HDPE PN-6 125 1.1178
6 HDPE PN-6 160 1.3174
7 HDPE PN-6 180 0.6262
8 HDPE PN-6 200 0.45
HSC Connection
Sno. Total Nos.
1 528
Other Details
2.99
0.00
2.99
14-May-2025
15-May-2025