| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097866 | Name of Scheme: PURMAI | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 3950 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-May-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 16.00/90.00 | PURMAI | 25'.785449" N | 80.920091"8 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 770/60 | PURMAI | 25'.785449" N | 80.920091"8 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 225/14 | PURMAI | 25'.785449" N | 80.920091"8 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.t. K-9 | 125 | .02925 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.387 | |
| 2 | HDPE | 75 | 0.8364 | |
| 3 | HDPE | 90 | 0.6356 | |
| 4 | HDPE | 110 | 1.243 | |
| 5 | HDPE | 125 | 1.0318 | |
| 6 | HDPE | 140 | 1.4666 | |
| 7 | HDPE | 160 | 0.193 | |
| 8 | HDPE | 180 | 0.1858 | |
| 9 | HDPE | 200 | 0.03 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 810 |