Project Completion Certificate (Ground Water)
Scheme ID: 20098084 Name of Scheme: KHATKI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4251 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 18-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-2 Nos. 48.2 Mtr / 199.39 Mtr KHATKI 28.974412, 28.978647 77.964571, 77.965491
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible - 2 Nos 350 LPM / 56 Mtr KHATKI 28.974412, 28.978647 77.964571, 77.965491
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes KHATKI 28.974412, 28.978647 77.964571, 77.965491
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0905
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.607
2 HDPE 90 1.439
3 HDPE 110 1.055
4 HDPE 125 0.766
5 HDPE 140 0.672
HSC Connection
Sno. Total Nos.
1 808
Other Details
2.77
2.77
2.30
04-Aug-2024
05-Aug-2024