Project Completion Certificate (Ground Water)
Scheme ID: 20098225 Name of Scheme: KHARUWAON Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2930 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 16-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 12M/109.8M KHARUWAON 26.353492 83.005736
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 600LPM/46M KHARUWAON 26.353492 83.005736
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175KL/14M KHARUWAON 26.353492 83.005736
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.444
2 HDPE Pipe PN-6: Class PE-100 75 0.386
3 HDPE Pipe PN-6: Class PE-100 63 13.768
4 HDPE Pipe PN-6: Class PE-100 110 1.963
5 HDPE Pipe PN-6: Class PE-100 125 0.358
6 HDPE Pipe PN-6: Class PE-100 160 0.094
HSC Connection
Sno. Total Nos.
1 424
Other Details
2.49
2.49
2.49
18-Nov-2025
19-Nov-2025