Project Completion Certificate (Ground Water)
Scheme ID: 20098952 Name of Scheme: BAHADUR CHAK CHITTAURA (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Dec-2024 Actual Date of Completion (Capex): 26-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.24/242.35 Bahadur Chak 27.560415 81.693087
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 0.45cum/min, 45m Bahadur Chak 27.560415 81.693087
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 125kl,12m Bahadur Chak 27.560415 81.693087
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K9/DI 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN6/HDPE 63 4.720
2 PN6/HDPE 75 0.253
3 PN6/HDPE 90 0.108
4 PN6/HDPE 110 0.051
5 PN6/HDPE 160 0.887
HSC Connection
Sno. Total Nos.
1 364
Other Details
1.86
1.86
1.83
26-Mar-2026
27-Mar-2026