| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099158 | Name of Scheme: Parshu PWS | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2551 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 21-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.03 M / 234.33 M | PERSU & BELHUPUR | 26.67021 | 79.677685 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 550 LPM/ 49 M | PERSU & BELHUPUR | 26.67021 | 79.677685 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL / 12 M | PERSU & BELHUPUR | 26.67021 | 79.677685 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.013 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.162 | |
| 2 | HDPE | 90 | 1.930 | |
| 3 | HDPE | 110 | 0.249 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 513 |