Project Completion Certificate (Ground Water)
Scheme ID: 20099367 Name of Scheme: Thegipur Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 6
Total Population Covered: 2590 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Mar-2024 Actual Date of Completion (Capex): 15-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 24.10 M/ 57.78 M Thegi pratappur 26.345938 83.040294
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 5400LPM/49M Thegi pratappur 26.345938 83.040294
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 150KL/18MTR Thegi pratappur 26.345938 83.040294
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.0315
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.4542
2 HDPE Pipe PN-6: Class PE-100 75 2.652
3 HDPE Pipe PN-6: Class PE-100 63 4.540
4 HDPE Pipe PN-6: Class PE-100 110 3.253
5 HDPE Pipe PN-6: Class PE-100 140 0.4889
6 HDPE Pipe PN-6: Class PE-100 160 0.1293
HSC Connection
Sno. Total Nos.
1 290
Other Details
2.33
2.32
2.32
15-Feb-2026
16-Feb-2026