Project Completion Certificate (Ground Water)
Scheme ID: 20099681 Name of Scheme: Mahrajpur G.P. Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1910 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 06-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Drilling & Lowering of tubewell 18/95.95 Mahrajpur 26.448028 83.827422
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400/40 Mahrajpur 26.448028 83.827422
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/14 Mahrajpur 26.447924 83.827544
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 80 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 6.392
2 HDPE Pipe 75 0.829
3 HDPE Pipe 90 0.286
4 HDPE Pipe 110 1.462
5 HDPE Pipe 125 0.756
6 HDPE Pipe 160 0.040
HSC Connection
Sno. Total Nos.
1 416
Other Details
1.52
1.52
1.79
06-Nov-2024
05-Feb-2025