Project Completion Certificate (Ground Water)
Scheme ID: 20099710 Name of Scheme: Bara Kheda No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1145 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-May-2024 Actual Date of Completion (Capex): 18-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 6/44.58 BARA KHEDA 26.48374 80.13484
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150/61 BARA KHEDA 26.48374 80.13484
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50/14 BARA KHEDA 26.48374 80.13484
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.01055
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.630
2 HDPE 90 3.605
3 HDPE 110 0.260
4 HDPE 125 0.589
5 HADP 140 0.471
HSC Connection
Sno. Total Nos.
1 302
Other Details
1.90
0.00
1.55
02-May-2024
03-May-2024