Project Completion Certificate (Ground Water)
Scheme ID: 20099718 Name of Scheme: Bhaupur No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 534 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-May-2024 Actual Date of Completion (Capex): 24-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 6/108.8 BHAUPUR 26.471261 80.129892
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 100/59 BHAUPUR 26.471261 80.129892
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT NO OHT BHAUPUR 26.471261 80.129892
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.825
2 HDPE 90 0.682
3 HDPE 110 0.219
4 HDPE 125 1.001
HSC Connection
Sno. Total Nos.
1 120
Other Details
1.20
0.00
1.01
08-May-2024
09-May-2024