Project Completion Certificate (Ground Water)
Scheme ID: 20099798 Name of Scheme: BAKSHI PURA CHITTAURA (VPL) MVS PWS No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4400 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Dec-2024 Actual Date of Completion (Capex): 18-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.20/241.30 Bakshipura/Maharaj Gaon 27.582929 81.635454
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 0.95cum/min, 45m Bakshipura/Maharaj Gaon 27.582929 81.635454
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 275kl,14m Bakshipura/Maharaj Gaon 27.582929 81.635454
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K9/DI 125 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN6/HDPE 63 3.407
2 PN6/HDPE 75 0.374
3 PN6/HDPE 90 0.363
4 PN6/HDPE 110 0.164
5 PN6/HDPE 200 0.780
HSC Connection
Sno. Total Nos.
1 380
Other Details
3.26
3.26
2.12
20-Mar-2026
25-Mar-2026