Project Completion Certificate (Ground Water)
Scheme ID: 20099982 Name of Scheme: Bohla W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 989 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/89.40 BOHLA 29.095797 77.203970
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 200LPM/42M BOHLA 29.095797 77.203970
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75KL/12M BOHLA 29.095711 77.204112
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 100 0.0212
2 K7 150 0.0051
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.1037
2 HDPE 75 0.3411
3 HDPE 63 1.6095
4 HDPE 110 0.008
HSC Connection
Sno. Total Nos.
1 210
Other Details
1.02
1.02
1.04
10-Mar-2026
11-Mar-2026