| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100080 | Name of Scheme: NEEBHI JJM | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1250 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2024 | Actual Date of Completion (Capex): 18-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12M/ 102M | NEEBHI | 27.242369 | 80.321833 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.27 M³ per Min /41Mtr | NEEBHI | 27.242369 | 80.321833 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75KL/ 12M | NEEBHI | 27.240022 | 80.320145 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D. I. Pipe | 100 | 0.01564 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 0.901 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 0.890 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 0.487 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 0.379 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 0.415 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.569 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 206 |