Project Completion Certificate (Ground Water)
Scheme ID: 20100206 Name of Scheme: Chelapur WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1225 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 15-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30.04 / 100.20 Chelapur 29.078083 78.487224
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 240 / 50 Chelapur 29.078083 78.487224
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 / 14 Chelapur 29.078083 78.487224
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.166
2 HDPE 75 0.4885
3 HDPE 90 0.812
4 HDPE 125 0.166
5 HDPE 140 0.2342
HSC Connection
Sno. Total Nos.
1 277
Other Details
1.46
0.00
1.50
15-Nov-2025
16-Nov-2025