Scheme ID: 20100230 Name of Scheme: BIRDO NANGLI WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2888 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 04-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 30/144.43 BIRDO NANGLI 29.49550 78.29111
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 600/60 BIRDO NANGLI 29.49550 78.29111
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 BIRDO NANGLI 29.49550 78.29111
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.5026
2 HDPE 75 1.3265
3 HDPE 90 1.758
4 HDPE 110 0.4274
5 HDPE 125 0.1103
6 HDPE 140 0.3702
HSC Connection
Sno. Total Nos.
1 391
Other Details
2.01
0.00
2.09
04-Sep-2025
05-Sep-2025