| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100328 | Name of Scheme: Sikri WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1317 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Mar-2025 | Actual Date of Completion (Capex): 05-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18 M / 112 M | Sikri | 28.382025 | 77.941247 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 250 LPM / 48 M | Sikri | 28.382025 | 77.941247 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75 KL / 12 M | Sikri | 28.382161 | 77.941141 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.0406 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.369 | |
| 2 | HDPE | 75 | 0.178 | |
| 3 | HDPE | 90 | 0.064 | |
| 4 | HDEP | 110 | 1.69 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 295 |