Project Completion Certificate (Ground Water)
Scheme ID: 20100393 Name of Scheme: Jatvai WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1963 Base Year: 2022 Intermediate Year: 2037 Design Year: 2022
Date of Completion (As per Contract): 30-Jun-2024 Actual Date of Completion (Capex): 27-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.09 Jatvai 28.389397 78.07043
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 420LPM/43Mtr Jatvai 28.389397 78.07043
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping scheme 125KL/12Mtr Jatvai 28.389397 78.07043
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.2496
2 HDPE 75 0.9946
3 HDPE 90 0.1656
4 HDPE 110 0.2753
5 HDPE 160 0.4290
HSC Connection
Sno. Total Nos.
1 331
Other Details
1.67
0.00
1.73
27-Mar-2024