| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100408 | Name of Scheme: Kisola WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1934 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2022 |
| Date of Completion (As per Contract): 22-Nov-2024 | Actual Date of Completion (Capex): 27-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.08 | Kisola | 28.630363 | 78.107175 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 350LPM/43Mtr | Kisola | 28.630363 | 78.107175 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Direct Pumping scheme | 100KL/12Mtr | Kisola | 28.630363 | 78.107175 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DL-K7 | 100 | 25 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.2783 | |
| 2 | HDPE | 75 | 0.3029 | |
| 3 | HDPE | 90 | 0.1788 | |
| 4 | HDPE | 140 | 0.1207 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 387 |