Project Completion Certificate (Ground Water)
Scheme ID: 20100795 Name of Scheme: URAULI No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3338 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 25.50/75.80 URAULI 25'.814878',N 80.500684"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 840/60 URAULI 25'.814878',N 80.500684"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 250KL/20M URAULI 25'.814878',N 80.500684"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 150 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.431
2 HDPE 180 0.158
3 HDPE 160 1.223
4 HDPE 140 3.878
5 HDPE 125 0.586
6 HDPE 110 1.657
7 HDPE 90 2.183
8 HDPE 75 2.982
9 HDPE 63 6.402
HSC Connection
Sno. Total Nos.
1 978
Other Details
4.44
0.00
4.47
10-Jun-2025
11-Jun-2025