Project Completion Certificate (Ground Water)
Scheme ID: 20100872 Name of Scheme: Raipur Malihabad WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 978 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Jan-2025 Actual Date of Completion (Capex): 27-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 80 0.02
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 2.45
2 HDPE PIPE PN -6: CLASS PE -100 75 0.99
3 HDPE PIPE PN -6: CLASS PE -100 90 0.10
4 HDPE PIPE PN -6: CLASS PE -100 110 1.82
HSC Connection
Sno. Total Nos.
1 245
Other Details
1.34
1.34
1.28
28-Feb-2025
01-Mar-2025