| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101031 | Name of Scheme: FAKERPUR BERWA GRAMM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 860 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Apr-2025 | Actual Date of Completion (Capex): 10-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150mm dia plain pipe | 86.50 | fakerpur | 26.8508 | 79.901964 |
| 2 | 150mm Slotted pipe | 9 | fakerpur | 26.8508 | 79.901964 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 170/59 | fakerpur | 26.8508 | 79.901964 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 80 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution pipe/HDPE | 63 | 1.232 | |
| 2 | Distribution pipe/HDPE | 75 | 0.141 | |
| 3 | Distribution pipe/HDPE | 90 | 0.135 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 139 |