Project Completion Certificate (Ground Water)
Scheme ID: 20101167 Name of Scheme: MARGUPUR & KASTURIPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 20
Total Population Covered: 3760 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Mar-2024 Actual Date of Completion (Capex): 12-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 8.57m/47.86m MARGUPUR & KASTURIPUR 25.911184 82.445642
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15HP 693LPM/43M MARGUPUR & KASTURIPUR 25.911184 82.445642
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT25.911 225KL/14m MARGUPUR & KASTURIPUR 25.911226 82.445517
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0332 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.4732 Yes
2 HDPE 75 3.8305 Yes
3 HDPE 63 15.6755 Yes
4 HDPE 110 2.769 Yes
5 HDPE 140 2.3991 Yes
6 HDPE 160 0.8839 Yes
7 HDPE 200 0.0275 Yes
HSC Connection
Sno. Total Nos.
1 426
Other Details
3.42
3.42
2.87
12-Oct-2024
12-Oct-2024