Project Completion Certificate (Ground Water)
Scheme ID: 20101800 Name of Scheme: BOREKI WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2611 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 20-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 30/126.52 BOREKI 29.583856 78.314115
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550/60 BOREKI 29.583856 78.314115
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 14 MTR BOREKI 29.583856 78.314115
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.0345
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.503
2 HDPE 75 1.398
3 HDPE 90 0.9031
4 HDPE 110 0.003
5 HDPE 125 0.054
6 HDPE 140 0.027
7 HDPE 160 0.068
HSC Connection
Sno. Total Nos.
1 515
Other Details
1.95
0.00
1.95
20-Nov-2025
21-Nov-2025