Project Completion Certificate (Ground Water)
Scheme ID: 20101906 Name of Scheme: BHOGPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4538 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 17-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 29 / 143.11 Bhogpur 29.512849 78.670815
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 950 / 60 Bhogpur 29.512849 78.670815
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 275 / 18 Bhogpur 29.512849 78.670815
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 43.334
2 HDPE 75 2.873
3 HDPE 90 2.248
4 HDPE 110 1.756
5 HDPE 125 0.509
6 HDPE 160 0.998
HSC Connection
Sno. Total Nos.
1 1150
Other Details
3.67
0.00
4.31
17-Dec-2025
18-Dec-2025