Scheme ID: 20101947 Name of Scheme: PURE SOHRAT SINGH WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1416 Base Year: 2023 Intermediate Year: 2039 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 28-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 16/85.30 PURE SOHRAT SINGH 26.461159 81.635557
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 / 50 PURE SOHRAT SINGH 26.461159 81.635557
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 /12 PURE SOHRAT SINGH 26.461159 81.635557
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.289
2 HDPE 90 0.274
3 HDPE 110 0.051
4 HDPE 125 0.296
HSC Connection
Sno. Total Nos.
1 234
Other Details
1.40
0.00
1.38
28-Sep-2024
30-Dec-2024