Project Completion Certificate (Ground Water)
Scheme ID: 20101983 Name of Scheme: GOPALPUR SECOND WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1210 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 28-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 16/56.3 GOPALPUR SECOND 26.202762 82.238375
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 250LPM/45 GOPALPUR SECOND 26.202762 82.238375
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75/14 GOPALPUR SECOND 26.202762 82.238375
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 .023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPEPN6 CLASS PE-100 63 5.695
2 HDPE PIPEPN6 CLASS PE-100 75 1.486
3 HDPE PIPEPN6 CLASS PE-100 90 .346
4 HDPE PIPEPN6 CLASS PE-100 110 .199
5 HDPE PIPEPN6 CLASS PE-100 140 .016
HSC Connection
Sno. Total Nos.
1 280
Other Details
1.37
0.00
1.44
08-Jan-2026
01-Feb-2026