| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101983 | Name of Scheme: GOPALPUR SECOND WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1210 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-Jun-2024 | Actual Date of Completion (Capex): 28-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 16/56.3 | GOPALPUR SECOND | 26.202762 | 82.238375 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 250LPM/45 | GOPALPUR SECOND | 26.202762 | 82.238375 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75/14 | GOPALPUR SECOND | 26.202762 | 82.238375 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | .023 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPEPN6 CLASS PE-100 | 63 | 5.695 | |
| 2 | HDPE PIPEPN6 CLASS PE-100 | 75 | 1.486 | |
| 3 | HDPE PIPEPN6 CLASS PE-100 | 90 | .346 | |
| 4 | HDPE PIPEPN6 CLASS PE-100 | 110 | .199 | |
| 5 | HDPE PIPEPN6 CLASS PE-100 | 140 | .016 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 280 |