Project Completion Certificate (Ground Water)
Scheme ID: 20102050 Name of Scheme: KASERUWA No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 2670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Jan-2025 Actual Date of Completion (Capex): 27-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 550 LPM 14 M / 122.30 M KASERUWA 25.923765 81.162863
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 550 LPM / 60 Mtr. KASERUWA 25.923765 81.162863
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 175 KL / 16 M KASERUWA 25.923794 81.162783
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 63 1.8260
2 HDPE PIPE PN-6 75 2.37080
3 HDPE PIPE PN-6 90 2.03360
4 HDPE PIPE PN-6 110 1.3424
5 HDPE PIPE PN-6 125 0.335
6 HDPE PIPE PN-6 140 0.4708
7 HDPE PIPE PN-6 160 1.066
8 HDPE PIPE PN-6 200 1.63720
HSC Connection
Sno. Total Nos.
1 380
Other Details
3.06
0.00
3.06
27-Feb-2026
28-Feb-2026