| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102050 | Name of Scheme: KASERUWA | No. of Villages: 1 | No. of Habitation Covered: 10 |
| Total Population Covered: 2670 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 23-Jan-2025 | Actual Date of Completion (Capex): 27-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 550 LPM | 14 M / 122.30 M | KASERUWA | 25.923765 | 81.162863 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 15 HP Submersible Pump | 550 LPM / 60 Mtr. | KASERUWA | 25.923765 | 81.162863 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 175 KL / 16 M | KASERUWA | 25.923794 | 81.162783 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 63 | 1.8260 | |
| 2 | HDPE PIPE PN-6 | 75 | 2.37080 | |
| 3 | HDPE PIPE PN-6 | 90 | 2.03360 | |
| 4 | HDPE PIPE PN-6 | 110 | 1.3424 | |
| 5 | HDPE PIPE PN-6 | 125 | 0.335 | |
| 6 | HDPE PIPE PN-6 | 140 | 0.4708 | |
| 7 | HDPE PIPE PN-6 | 160 | 1.066 | |
| 8 | HDPE PIPE PN-6 | 200 | 1.63720 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 380 |