Project Completion Certificate (Ground Water)
Scheme ID: 20102090 Name of Scheme: KALYANPUR WSS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 997 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 05-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30/156.40 KALYANPUR 29.618109 78.237142
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 210/56 KALYANPUR 29.618109 78.237142
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL / 12 MTR KALYANPUR 29.618109 78.237142
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 2.82395
2 HDPE PIPE 75 0.3567
3 HDPE PIPE 90 0.173
4 HDPE PIPE 110 0.42
HSC Connection
Sno. Total Nos.
1 266
Other Details
1.46
0.00
1.48
05-Aug-2025
06-Aug-2025