Project Completion Certificate (Ground Water)
Scheme ID: 20102321 Name of Scheme: RASULPUR VEERAN WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 12-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 30.02/ 158.87 RASOOLPUR VEERAN 29.309028 78.70002
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 300/47 RASOOLPUR VEERAN 29.309028 78.70002
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.35969
2 HDPE 75 1.175
3 HDPE 90 0.3417
4 HDPE 110 2.5694
5 HDPE 140 0.02
HSC Connection
Sno. Total Nos.
1 96
Other Details
1.28
0.00
1.41
12-Aug-2025
13-Aug-2025