| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 2758991 | Name of Scheme: Gajyee Kol | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2390 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Apr-2025 | Actual Date of Completion (Capex): 10-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 36.15/101.69 | Ganjaikol | 26.5246 | 83.5021 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 30/41 | Ganjaikol | 26.5246 | 83.5021 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 (Retrofitting Work) | - | Ganjaikol | 26.5246 | 83.5021 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.015 | Laying Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.452 | Laying Completed |
| 2 | HDPE | 90 | 0.091 | Laying Completed |
| 3 | HDPE | 140 | 0.741 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 428 |