Project Completion Certificate (Ground Water)
Scheme ID: 8359732 Name of Scheme: BIJNA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 10280 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Aug-2023 Actual Date of Completion (Capex): 05-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 40.34 MTR / 101.15 MTR BIJNA 28.864125 78.818517
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 1400 LPM / 47 MTR BIJNA 28.864125 78.818517
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL / 14 MTR BIJNA 28.863809 78.81842
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.0135 OK
2 K-7 DI PIPE 250 0.181 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.464 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.435 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 4.624 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.692 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.549 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.030 OK
7 HDPE PIPE PN-6: CLASS PE-100 200 0.386 OK
HSC Connection
Sno. Total Nos.
1 930
Other Details
3.12
3.04
3.12
04-Nov-2024
05-Nov-2024