Project Completion Certificate (Ground Water)
Scheme ID: 8359739 Name of Scheme: Mohammadpur Maphy VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 8629 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2023 Actual Date of Completion (Capex): 18-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 41.34MTR/101.35MTR MOHAMMADPUR MAPHY 29.068733 78.620212
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 1200LPM/40MTR MOHAMMADPUR MAPHY 29.068733 78.620212
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/12MTR MOHAMMADPUR MAPHY 29.068666 78.620381
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.0225 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.158 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.171 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 2.392 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.225 OK
5 HDPE PIPE PN-6: CLASS PE-100 125 0.01 OK
6 HDPE PIPE PN-6: CLASS PE-100 140 0.055 OK
7 HDPE PIPE PN-6: CLASS PE-100 160 0.139 OK
8 HDPE PIPE PN-6: CLASS PE-100 180 0.357 OK
9 HDPE PIPE PN-6: CLASS PE-100 200 0.128 OK
HSC Connection
Sno. Total Nos.
1 752
Other Details
2.22
2.16
2.22
17-Mar-2025
18-Mar-2025