Project Completion Certificate (Ground Water)
Scheme ID: 8360479 Name of Scheme: UDHOPURA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2538 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 18-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12.02 MTR / 99.54 MTR UDHOPURA 29.048302 78.917251
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 150 LPM / 44 MTR UDHOPURA 29.048302 78.917251
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL / 12 MTR UDHOPURA 29.048403 78.917328
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 80 0.0081 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.102 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.243 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 1.945 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.633 OK
5 HDPE PIPE PN-6: CLASS PE-100 160 0.037 OK
6 HDPE PIPE PN-6: CLASS PE-100 140 0.056 OK
HSC Connection
Sno. Total Nos.
1 238
Other Details
1.33
0.00
1.33
17-Jul-2024
18-Jul-2024