Project Completion Certificate (Ground Water)
Scheme ID: 8360481 Name of Scheme: MILAK AMAWTI VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4179 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.03 MTR / 109.66 MTR MILAK AMAWTI 28.999447 78.773885
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 600 LPM / 40 MTR. MILAK AMAWTI 28.999447 78.773885
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 14 MTR MILAK AMAWTI 28.999479 78.77394
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.017 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.741 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.589 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 4.344 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.124 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.659 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.084 OK
HSC Connection
Sno. Total Nos.
1 415
Other Details
2.00
0.00
2.00
20-Mar-2024
21-Mar-2024