Project Completion Certificate (Ground Water)
Scheme ID: 8360489 Name of Scheme: Sihari mala No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4570 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12 MTR / 88.27 MTR SIHARI MALA 28.602643 78.855026
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 300 LPM / 45 MTR SIHARI MALA 28.602643 78.855026
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 14 MTR SIHARI MALA 28.602728 78.854959
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.011 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.231 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.149 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 6.248 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.053 OK
5 HDPE PIPE PN-6: CLASS PE-100 160 0.037 OK
HSC Connection
Sno. Total Nos.
1 560
Other Details
1.70
0.00
1.70
17-Mar-2024