Project Completion Certificate (Ground Water)
Scheme ID: 8360494 Name of Scheme: KARSARA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5410 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Nov-2023 Actual Date of Completion (Capex): 15-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22.11 MTR / 79.45 MTR KARSARA 28.56368 78.823411
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 700 LPM / 44 MTR KARSARA 28.563682 78.823411
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL / 11 MTR KARSARA 28.56354 78.823458
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.028 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.093 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 1.072 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 5.171 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.245 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.217 OK
6 HDPE PIPE PN-6: CLASS PE-100 200 0.228 OK
HSC Connection
Sno. Total Nos.
1 515
Other Details
1.96
0.00
1.96
19-Mar-2024
20-Mar-2024