Project Completion Certificate (Ground Water)
Scheme ID: 8360500 Name of Scheme: Hajipur No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 19-Sep-2023 Actual Date of Completion (Capex): 21-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.06 MTR / 93.44 MTR HAJIPUR 28.543355 78.820457
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 500 LPM / 45 MTR HAJIPUR 28.543355 78.820457
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 12 MTR HAJIPUR 28.543355 78.820457
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.011 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.098 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.547 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 4.387 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 1.502 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.305 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.027 OK
HSC Connection
Sno. Total Nos.
1 415
Other Details
1.77
0.00
1.77
21-Mar-2024
22-Mar-2024