Project Completion Certificate (Ground Water)
Scheme ID: 8360504 Name of Scheme: MANKARA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4460 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2022 Actual Date of Completion (Capex): 01-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.06 MTR / 112.24 MTR MANKARA 28.784435 78.939585
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 600 LPM / 40 MTR MANKARA 28.784435 78.939585
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 12 MTR MANKARA 28.784315 78.939676
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.040 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.082 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.723 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 6.133 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.440 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.264 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.895 OK
HSC Connection
Sno. Total Nos.
1 425
Other Details
2.24
0.00
2.16
01-Dec-2024
02-Dec-2024