Project Completion Certificate (Ground Water)
Scheme ID: 8361871 Name of Scheme: SATTI No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 6720 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2021 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 54.02/381.65 Satti 26.248702 79.726518
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 49.50/60 Satti 26.248702 79.726518
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400/16 Satti 26.248702 79.726518
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 1.035 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.80 As per Site
2 HDPE 75 1.50
3 HDPE 90 0.870
4 HDPE 110 0.345
5 HDPE 140 0.425
6 HDPE 160 0.070
7 HDPE 180 0.117
8 HDPE 200 0.210
HSC Connection
Sno. Total Nos.
Other Details
3.85
4.55
4.55
30-Sep-2023
01-Oct-2023