Project Completion Certificate (Ground Water)
Scheme ID: 8388475 Name of Scheme: Jangal Pakri Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 10-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.04/93.53 Jangal Pakri 26.8233 83.4337
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 45/39 Jangal Pakri 26.8233 83.4337
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 175/12 Jangal Pakri 26.8233 83.4337
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.05 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 hdpe 63 12.309 Laying Completed
2 HDPE 75 0.248 Laying Completed
3 HDPE 90 0.058 Laying Completed
4 HDPE 110 0.399 Laying Completed
5 HDPE 140 0.696 Laying Completed
6 HDPE 160 0.016 Laying Completed
HSC Connection
Sno. Total Nos.
1 522
Other Details
2.70
0.00
2.57
23-Feb-2024
01-Apr-2026