Project Completion Certificate (Ground Water)
Scheme ID: 8388621 Name of Scheme: Agarai No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2115 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 22-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15 M / 81.55 M Agarai 28.321488 77.820720
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 46.60 M Agarai 28.321488 77.820720
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 12 M Agarai 28.321639 77.820632
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.87
2 HDPE 75 0.24
3 HDPE 90 0.21
4 HDPE 110 0.064
5 HDPE 140 0.37
HSC Connection
Sno. Total Nos.
1 491
Other Details
1.57
1.45
1.56
15-Nov-2025
16-Nov-2025