Project Completion Certificate (Ground Water)
Scheme ID: 8388638 Name of Scheme: Atmadsarai No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3816 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 08-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.14 M / 96.41 M Atmadsarai 28.499768 77.834789
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 800 LPM / 46.60 M Atmadsarai 28.499768 77.834789
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 12 M Atmadsarai 28.499856 77.834502
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.90
2 HDPE 75 0.40
3 HDPE 90 0.41
4 HDPE 110 0.12
5 HDPE 140 0.05
6 HDPE 160 0.40
HSC Connection
Sno. Total Nos.
1 754
Other Details
2.22
2.07
2.23
16-Jul-2025
17-Jul-2025